What does it cost to acquire a connection approval, a connection contract, metering point acceptance, and a connection when the nominal value of the main fuse is 3 x 20 A?

Category: Change and new connection approval

The costs of connecting to the electricity distribution network depend on the connected load (network access) and the costs of acceptance and connecting the metering point.

Below is an example of the total costs when the nominal value of the main fuse is 3 x 20 A.

New connected load (network access) EUR 484,12
Acceptance and connection EUR 121,36 €
Total payment EUR 605,48 €

The investor is obliged to provide the project documentation for the connection and its implementation.

Prices do not include VAT.