Who is responsible for disconnecting the metering point from the distribution network?

Category: Disconnection and reconnection

The requirement for electric power  to be continuously distributed of through the metering point represents a fulfilment of the technical conditions stated in the connection approval, the legislation, and a valid contract. In the event of failure to comply with these conditions, the system operator has the right to disconnect your metering point from the network after giving prior notice.