Frequently asked question

Change and new connection approval

What are the costs of network access for each individual connected load?

The prices of network access (one-time payment) can be found on the Energy Agency's website.

Change and new connection approval

What are the costs of acquiring connection approval, a connection contract, metering point acceptance, and connection when the nominal value of main fuse is 3 x 20 A?

The costs of connecting to the electricity distribution network depend on the connected load (network access) and the costs of acceptance and connecting the metering point.

Change and new connection approval

What are the costs of new connected load for a household in the event of an increase from 1 x 020 A to 1 x 035 A?

What are the costs of new connected load for a household in the event of an increase from 1 x 020 A to 1 x 035 A?

Change and new connection approval

When is it necessary to acquire approval to connect to a new distribution network?

The network user must apply for new connection approval if the basic parameters on which the current connection approval was issued change.

Change and new connection approval

What are the costs of work carried out by a person authorized by the system operator (acceptance and connection) when connecting a new metering point or changing the current one?

You can view the costs in the pricelist Services for users (paragraph B-4).