Frequently asked question

Change and new connection approval

What is the cost of network access for each individual connected load?

The prices of network access (one-off payment) can be found on the Energy Agency's website.

Change and new connection approval

What does it cost to acquire a connection approval, a connection contract, metering point acceptance, and a connection when the nominal value of the main fuse is 3 x 20 A?

The costs of connecting to the electricity distribution network depend on the connected load (network access) and the costs of acceptance and connecting the metering point.

Change and new connection approval

What are the costs of a new connected load for a household in the event of an increasing the main fuse from 1 x 20 A to 1 x 35 A?

What are the costs of a new connected load for a household in the event of increasing the main fuse from from 1 x 20 A to 1 x 35 A?

Change and new connection approval

When do I need to acquire approval to connect to a new distribution network?

The network user must apply for new connection approval if the basic parameters on which the current connection approval was issued change.

Change and new connection approval

How much does it cost when a person authorised by the system operator (acceptance and connection) connects a new metering point or changes the current one?

You can view the costs in the Services for Users pricelist (B-4).